2005 to 2007

Verizon   Southern California

 - 50 Miles of duct placement for FTTP project

- Pulling and placement of new fiber optic cable

- Placement of all vaults, pedestals, and other necessary structures

- Splicing of fiber optic new build and upgrade

 2003 to 2004

Cox Communications   Fairfax County, Virginia

 - 100 Miles of upgrade consisting of directional boring conduit both coax and fiber

   Optic

- Pulling new coax and fiber optic cable

- Setting all vaults, pedestals, and other necessary structures

- Completing drops to the house

 2002 to 2003

Comcast Cablevision   Detroit, Michigan ,

 - Built downtown Detroit's complete fiber optic systems tying in all banks and

   businesses on their own fiber network I

- Job consisted of 50 miles of directional boring and cohduit

- Setting all underground vaults

- Splicing and activating all fiber network

- All production done at night due to work being done in downtown area

- All time frames were met and all concrete was restored for morning business indowntown area 

2000 to 2001

Comcast Cablevision    Little Rock, Arkansas

 Upgrade Coax Splicing

- 650 miles of upgrade

- 40 splicers - 20 miles per week x 8 months

 Aerial Placement

- 320,000 ft. of new and overlash cable

- Five crews - 2,000 ft. per day, per crew x 8 months

Underground Placement

- 96,000 ft. placed underground

- Six crews - 3,000 ft. per day, per crew x 8 months

 Fiber

- 60 miles of aerial and underground fiber

1999 to 2000

McLeod USA

- Complete fiber network underground and aerial. Fiber ring to connect four

   suburbs to the City of Chicago consisting of primarily 288 count fiber

- Total underground conduits - some 6 count conduits and some 12 count coduits

- Total underground conduits = 110 miles x 6 conduits or 12 conduits

- Aerial fiber - 85 miles built and spliced

- All hand holes and man holes were set and fiber racks installed

 1997 to 2000

AT&T Elk Grove, Schaumburg, Elmhurst, Downers Grove, McHenry, and Orland Park, Illinois

 - Complete rebuilds

- 200 miles of underground replacement

- 800 miles of aerial replacement and upgrade

 1996 to 2000

Ameritech Naperville, Schaumburg, Elgin, Orland Park, and Streamwood, Illinois

 - All projects were new build

- 100 miles of aerial and splicing

- 180 miles of underground and splicing

- 6,000 MDU (multi dwelling units) pre and post wire

 1994 to 1996

Southwest Bell Memphis and Nashville Areas

 - 1bree separate underground fiber projects

- 150 miles all underground

- All man holes and fiber racks installed

- Fiber spliced

 Design Construction

 Contract Communications Co., at the time under the company name Communications Professionals Inc., has interfaced a CATV duct system and fed coaxial cables to the White House and Executive Office Building, from the existing Chesapeake and Potomac Telephone Company ducts system. He maintained liaisons with the US State Department and the White House staffs.

Designed the cable routing system to accommodate more than 5,400 MDU's(multi

dwelling units) including the feed with appropriate signal levels. Designed bridge attachments for a duct system crossing three major rivers on three superstructures in Pittsburgh, PA. I Designed the CATV to feed twenty eight embassies on Embassy Row in Washington, D.C., as mandated by the DC Franchise Agreement in conjunction with the US State Department.

 Installation

MDU (multi dwelling units) installation of more than 20,000 units of the hi-rise type and an additional 60,000 non hi-rise units in Illinois, Virginia, North Carolina, and Maryland.

Buried service drop wires to thousands of MDU and single family homes.